Professional Design High Power Solar Lighting - MJLED-1601A/B/C Hot Sell Street Light Fixture With 20-200W LED – Mingjian Detail:
Product Details
Product Size
Product Parameters
Model No. |
Power |
Driver |
Input Voltage |
LED Type |
Material |
Install spigot |
Product Dimension |
Weight |
|||||||
MJLED-1601A |
120W-200W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
798x380x163mm |
CRI: Ra>70 |
|||||||
MJLED-1601B |
60W-120W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
560x241x111mm |
CRI: Ra>70 |
|||||||
MJLED-1601C |
20W-60W |
MW-XLG |
AC220-240V, |
Lumileds 3030 chips |
Die-casting ALU.+ |
60mm |
624x240x108mm |
CRI: Ra>70 |
Factory photo
Company profile
Zhongshan Mingjian Lighting Co., Ltd. is located in the beautiful lighting city-Guzhen town,Zhongshan city.The company covers and area of 20000 square meters,with 800T hydraulic linkage 14 meters bending machine.300T of hydraulic bending machine.two light pole production lines.new bring in 3000W optical fiber laser plate tube cutting machine.6000W fiber laser cutting machine.multi CNC bending machine.shearig machine,punching machine and rolling machine. We have professional,in dependent production capacity and technology of street light pole,high mast,landscape light pole,city sculpture,samrt street light pole,bridge high bay light,etc. The company accept customer’s drawing to customiized products.
FAQ
1. What are your prices?
Our prices are subject to change depending on supply and other market factors. We will send you an updated price list after your company contact us for further information.
2.How long is the sample production time?
Normally around 5-7 work days, except for special cases.
3.How to proceed an order?
First, let us know about your requirements or application details.
Second, we quote accordingly.
Third, customers confirm and pay the deposit
Finally, production is arranged.
4.Can you provide customized services?
Yes, we can provide one-stop solutions, such as ODM/OEM, lighting solution.
5.What kinds of payment methods do you accept?
You can make the payment to our bank account or Western Union :
30% deposit in advance, 70% balance before delivery.
6.What is your terms of payment?
We accept T/T, irrevocable L/C at sight usually. For regular orders, 30% deposit, balance before loading.
Product detail pictures:
Related Product Guide:
Our well-equipped facilities and great excellent command throughout all stages of generation enables us to guarantee total customer fulfillment for Professional Design High Power Solar Lighting - MJLED-1601A/B/C Hot Sell Street Light Fixture With 20-200W LED – Mingjian, The product will supply to all over the world, such as: Florida, moldova, Singapore, We have a good reputation for stable quality products, well received by customers at home and abroad. Our company would be guided by the idea of Standing in Domestic Markets, Walking into International Markets. We sincerely hope that we could do business with car manufacturers, auto part buyers and the majority of colleagues both at home and abroad. We expect sincere cooperation and common development!
By Stephen from Tanzania - 2017.09.26 12:12
The company has rich resources, advanced machinery, experienced workers and excellent services, hope you keep improving and perfecting your products and service, wish you better!
By Mario from Sacramento - 2018.09.21 11:44